Navigating the ADU Permitting Process
- Jon Melicharek
- Sep 30
- 4 min read
Building an Accessory Dwelling Unit (ADU) is an exciting way to add value and flexibility to your property. Whether you want a cozy rental, a private office, or a guest house, an ADU can be a game-changer. But before you start construction, you need to navigate the permitting maze. Don’t worry! I’m here to walk you through the steps with confidence and clarity. Let’s dive into this ADU permitting guide and make your dream project a reality.
Understanding the ADU Permitting Guide: What You Need to Know
The first step in any ADU project is understanding the rules and regulations. California has made it easier than ever to build ADUs, but each city and county may have its own specific requirements. Here’s what you should focus on:
Zoning laws: Check if your property is in a zone that allows ADUs. Most residential zones do, but there are exceptions.
Size limits: ADUs usually have maximum size limits based on your lot size and the size of your main house.
Setbacks and height restrictions: These rules determine how far your ADU must be from property lines and how tall it can be.
Parking requirements: Some areas require additional parking spaces for ADUs, while others have waived this rule.
Design standards: Your ADU might need to match the style or materials of your main house.
Getting familiar with these basics helps you avoid surprises later. You can find detailed information on your local city or county website, or better yet, consult with experts who specialize in ADU projects.

Step-by-Step ADU Permitting Guide: From Plans to Approval
Now that you know the basics, let’s break down the permitting process into clear, manageable steps:
Pre-Application Research
Start by gathering all necessary information about your property and local regulations. This includes zoning maps, setback rules, and any design guidelines.
Design Your ADU
Work with an architect or a design-build company to create plans that meet your needs and comply with local codes. Keep your design simple and efficient to speed up approval.
Prepare Your Application
Your application package usually includes:
Site plans
Floor plans
Elevations
Structural details
Energy compliance forms
Submit Your Application
Submit your complete application to your city or county planning department. Some places offer online submission, which can save time.
Plan Check and Review
The planning department reviews your application for compliance. They may request changes or additional information. Respond promptly to keep things moving.
Permit Issuance
Once approved, you’ll receive your building permit. This allows you to start construction legally.
Inspections During Construction
Expect several inspections to ensure your ADU is built safely and according to code. Schedule these as required.
Final Approval and Occupancy
After passing all inspections, you get a certificate of occupancy. Your ADU is now ready to use!
Following these steps carefully can save you time and headaches. Remember, patience and clear communication with your local officials are key.

Can I Sell My House with an Unpermitted ADU?
This is a question I hear often. The short answer: it’s risky and can complicate your sale. Here’s why:
Disclosure requirements: California law requires sellers to disclose any unpermitted structures. Buyers will want to know if the ADU is not officially approved.
Financing issues: Many lenders hesitate to finance homes with unpermitted additions. This can limit your pool of buyers.
Lower appraisals: An unpermitted ADU might not add value in the eyes of appraisers, affecting your sale price.
Potential legal problems: If the ADU doesn’t meet safety codes, you could face fines or be required to remove it.
If you already have an unpermitted ADU, consider starting the permitting process before selling. Sometimes, it’s possible to get a permit retroactively, but it depends on your local rules and the condition of the ADU.

Tips to Speed Up Your ADU Permitting Process
The permitting process can feel slow, but you can take steps to speed it up:
Hire professionals: Architects, engineers, and ADU specialists know the rules and can prepare accurate plans.
Submit complete applications: Double-check your paperwork to avoid delays caused by missing information.
Communicate clearly: Stay in touch with your permitting office and respond quickly to requests.
Use pre-approved plans: Some cities offer pre-approved ADU designs that can fast-track your permit.
Understand local incentives: Some areas offer fee waivers or expedited reviews for ADUs.
By being proactive and organized, you can reduce waiting times and get your project moving faster.
Why Choose CASITA ADU for Your ADU Journey?
Building an ADU is a big step, and having the right partner makes all the difference. CASITA ADU specializes in making the entire process super easy and stress-free for homeowners across California, especially in the San Diego area. Here’s what sets us apart:
Expert guidance: We help you navigate every step of the adu permitting process, so you don’t have to guess.
Turnkey solutions: From design to construction, we handle it all.
Local knowledge: We know California’s rules inside and out.
Quality craftsmanship: Your ADU will be built to last and look great.
Ready to start your ADU project? Reach out to CASITA ADU and let’s make your vision come true!
Building an ADU is a fantastic way to enhance your property and lifestyle. With the right information and support, the permitting process doesn’t have to be overwhelming. Keep this guide handy, stay organized, and take advantage of expert help. Your new ADU is closer than you think!